Boiler Installation

- Two units 20t/hr Coal Fire Steam Boiler (PT. Broco Aerated Industry, 2015)


 

- One unit 20t/hr Coal Fire Steam Boiler (PT. Elang Perdana Tyres, 2015)


 

- One unit 20t/hr Coal Fire Steam Boiler & One unit 10MKcal/hr Thermal Oil Boiler

  (PT. Jiale Textile Indonesia, 2016)


 

- One unit 2.5MKcal/hr Thermal Oil Boiler (PT. Artha Prima, 2017)


 

One unit 15t/hr Coal Fire Steam Boiler & One unit 6MKcal/hr Thermal Oil Boiler

  (PT. Jiale Textile Indonesia, 2018)


 

- One unit 4t/hr Coal Fire Steam Boiler (PT. Polindo, 2019)


 

- One unit 4t/hr Coal Fire Steam Boiler (PT. Mitra Sukses Prasindo, 2020) 


 

One unit 10t/hr Coal Fire Steam Boiler (PT. Global Textile Indonesia, 2022) 


 
One unit 30t/hr Coal Fire Steam Boiler & One unit 24.5MKcal/hr Thermal Oil Boiler                (PT. Jiale Textile Indonesia, 2023) 


 

Back